The health and safety plan on site is the essential operational document for planning, executing, and supervising risk-prevention measures in any building or civil engineering project.
Drafting an adequate preventive plan looks like a purely administrative formality, but in everyday practice a copy-and-paste document usually ends in the precautionary suspension of the works or serious penalties. Omitting the plan, or failing to update it after changes in the work phases, can lead to fines above €40,000 and even criminal liability for the contractor.
In this step-by-step guide you will discover the mandatory legal structure, the key difference from the safety study, and how to digitise approval and monitoring to keep your sites compliant. To expand on the framework legislation, we recommend reading our article on construction site safety regulations.

Difference between the Safety Study and the Safety Plan
To ensure regulatory compliance in building works, it is vital not to confuse the document drafted at the project stage with the execution document.
Health and Safety Study (ESS)
It is drafted by the designer or the technician appointed by the developer during the project design stage. Its main purpose is to analyse the foreseeable risks of the environment and set the basis for preventive safety before the works are awarded.
Occupational Health and Safety Plan (PSST)
It is prepared exclusively by the main contractor before work begins. Its purpose is to adapt the requirements of the Safety Study to the machinery, execution methods, construction systems, and auxiliary means the contractor will actually use on site.
Mandatory structure of the Health and Safety Plan
A rigorous plan must respond precisely to the technical complexity of the works. Under Royal Decree 1627/1997, it must include the following core sections:
- Descriptive report: identification of the project, budgets, agents involved, and a detailed description of the construction process.
- Specific conditions specification: technical rules on the use of machinery, personal protective equipment (PPE), and auxiliary means.
- Safety drawings: graphic representation of collective protection, signage, access, evacuation, and temporary installations.
- Safety measurements and budget: the financial valuation of preventive measures, which can never be discounted at tender.
To keep exact traceability of the project's costs and unforeseen expenses, you can use the project budget management software.
Step-by-step process to draft and implement the plan
Processing and validating the plan requires a logical sequence coordinated between all the parties involved.
Step 1: Analyse the project's Safety Study. Review the developer's specifications and detect any deviations from the actual construction methods.
Step 2: Draft the plan for the real means. Detail the working procedures, specific machinery, temporary installations, and collective protective equipment.
Step 3: Submit to the Safety Coordinator. Send the plan to the Health and Safety Coordinator during execution for formal approval.
Step 4: Approval record and notification. Issue the formal approval record and notify the competent labour authority of the workplace opening.
Step 5: Distribution and addenda for changes. Distribute the document among subcontractors, self-employed workers, and prevention delegates, issuing addenda whenever execution changes.
You can manage notifications and assignments to the supervisors through the digital work reports.
Documentary control and addenda to the safety plan
The Health and Safety Plan is not a static document. Whenever construction procedures change, machinery on site varies, or new subcontractors join with new tasks, an addendum to the safety plan approved by the coordinator must be prepared.
Furthermore, the concurrence of staff requires rigorous Coordination of Business Activities (CAE). Failing to validate training certificates, medical clearances, or PPE handovers invalidates the site's safety framework. You can speed up the collection and signing of this documentation with our construction project management app.
How Trowel helps
| Problem | How Trowel solves it |
|---|---|
| Difficulty keeping the Safety Plan updated with subcontractor addenda | Trowel lets you archive and link preventive addenda to each work phase via the documentary management solution |
| Lack of control over the clock-in of unauthorised or untrained operators | A digital attendance control system that blocks site access if the worker's documentation is not in order |
| Loss of daily inspection reports for collective and safety protections | Real-time work reports and incidents from the mobile app with photo reporting and an instant report |
| Missing signed proof of PPE and tool handover to operators | Digital, on-the-move registration and signature of the handover of protective equipment and machinery assigned to each worker |
You can see the technical detail of each module in Trowel Academy.
Frequently asked questions
When is a Health and Safety Plan mandatory?
It is mandatory on every construction project that requires an execution project to be drafted, regardless of the scale or duration of the works.
Who approves the Health and Safety Plan on site?
On privately promoted building or civil works, it is approved by the Health and Safety Coordinator. For public-administration works, it is approved by the contracting body following a report from the project management team.
What happens if the way a task is executed changes on site?
Any relevant change in execution, machinery used, or work phases requires a modification or addendum to the plan, which must undergo the same formal approval as the original document.
Do self-employed workers have to draft their own Safety Plan?
No. Self-employed workers do not prepare their own plan. They are obliged to adhere to and strictly follow the Health and Safety Plan of the main contractor they work for.
Conclusion
A well-structured and up-to-date Health and Safety Plan on site is the best tool for eliminating risks, avoiding labour-inspection stoppages, and ensuring the works run without undue cost overruns.
Automating the documentary flow, on-site clock-ins, and safety records with specialised software removes the administrative chaos on site. If you want to simplify project control and comply with the law without wasting time, request a free Trowel demo.